Built in the U.S.A.
Hazlehurst, MS·Call 601.892.5017·ISO 9001:2015
The Challenge

Every project ends at a substation and a row of enclosures.

Solar, wind and storage projects differ at the generation end and look alike at the grid end: a collector or interconnection substation full of dead-ends, bus supports and equipment stands; rows of BESS enclosures, PCS and inverter housings; and the control, metering and auxiliary cabinets that tie it together. Those are long-lead fabricated items, and they sit on the critical path to the commercial operation date.

FabTek fabricates that scope at four plants in Hazlehurst, Mississippi: BESS enclosures and battery racks, PCS and inverter enclosures, dead-end and A-frame structures and bus supports and equipment stands for the interconnection substation, control and SCADA cabinets, equipment skids and platforms, and transformer cabinets for the step-up transformers. Structures are hot-dip galvanized to ASTM A123; enclosures are powder-coated in-house with an IEEE 2000-hour salt-spray rating. Our substation assembly crews can erect the steel.

Renewables & Energy Storage — FabTek Industries
What We Provide

What we can build for you.

Built for the schedule

Built for the schedule

Renewable projects are built on a COD, with liquidated damages behind it, and the fabricated scope is released late because the interconnection design finishes late. FabTek runs reserved capacity for developers and EPCs with a pipeline of projects, so the structures package and the enclosure order have a slot before the drawings are final. Our Substation Project Lifecycle series explains where steel falls in the schedule.

Why FabTek

Built for this segment.

Structures and enclosures from one source

Galvanizing and powder coat under one quality system

Field erection by our own crews

First-article-then-volume programs for repeat BESS enclosures

ISO 9001:2015, AWS-certified welding

U.S. fabrication with predominantly U.S.-sourced material fo

U.S. fabrication with predominantly U.S.-sourced material for projects with domestic-content requirements

FAQ

Questions, answered.

Does FabTek fabricate for solar and BESS projects?

Yes — BESS and PCS enclosures, battery racks, interconnection substation steel, equipment skids and control cabinets, built to print in Hazlehurst, Mississippi.

Which fabricators build enclosures and substation steel for energy storage developers?

FabTek supplies both the enclosures and the substation structures for storage and renewable interconnections, with field erection available.

Can you document domestic content?

Our tanks, structures and enclosures are fabricated in Mississippi from predominantly U.S.-sourced material; ask us about documentation for your project's requirements.

Do you build the battery system or inverter?

No — the enclosures, racks and steel around them. Listings and system design stay with the integrator.

Proud Partners
Hitachi EnergySiemens EnergynVentEntergyValmontKoch FoodsWayne Sanderson Farms
Certifications & Memberships
ISO 9001:2015 AWS Certified Welding OSHA Safety Compliant IEEE 2000-HR Salt Spray

Have a project to talk about?

Send the single-line, the site layout and the COD — we'll scope the fabricated package and reserve capacity against it.

Request a Quote