Built in the U.S.A.
Hazlehurst, MS·Call 601.892.5017·ISO 9001:2015
Footprint

Footprint, scaled ahead of demand.

Since committing the business to the power grid, a key objective has been to stay ahead of capacity — reinvesting in square footage before demand requires it. From 50K sq ft in 2024 to 250K sq ft in 2026.

With plans to continue investing in growth, FabTek anticipates achieving 500K sq ft by 2030.

2024202520262027202820292030
The Four Sites

Different buildings, one integrated floor.

All four facilities operate within the Jackson, Mississippi metro — close enough to share people, equipment, and work-in-process, far enough to let each site run its own production rhythm.

Aerial view of FabTek Industries' main production facility (Site 01) in Hazlehurst, Mississippi
Site 01 · Hazlehurst, MS

Headquarters — 125K sq ft

The original FabTek plant and company headquarters. Home to the fiber laser, CNC press brakes, and the powder coat line — the heart of the cabinet program, and the primary customer-facing site for tours and intake.

Top-down aerial view of FabTek Industries Site 02 production facility in Hazlehurst, Mississippi
Site 02 · Pearl, MS

Structural Production — 35K sq ft

Added to absorb growing transformer cabinet and enclosure volume, and to give the structural frames program a dedicated area — enabling the jump to hundreds of cabinets per month.

Interior production floor of FabTek Industries Site 03 in Hazlehurst, Mississippi
Site 03 · Terry, MS

Value-Added Services — 65K sq ft

The home of FabTek's value-added services — engineering support, rush-order fabrication, and on-site install and repair. Overhead-crane capacity handles the heavy and oversized work that has to move fast.

Indoor material storage racks of steel and stock at FabTek Industries Site 04 in Gallman, Mississippi
Site 04 · Gallman, MS

Material Storage — 25K sq ft

Dedicated indoor storage for raw steel, coil stock, and finished assemblies — racked, labeled, and inventory-controlled so material flows to the production floor on demand and outbound orders stage cleanly for shipment.

Strategic Location

Why Jackson, Mississippi.

At the crossroads of I-55 and I-20, FabTek sits within a day's freight of the fastest-growing power demand in the country — and the domestic steel that feeds it.

I-55 + I-20 crossroads

Where the north–south and east–west interstates meet.

Central shipping reach

About 70% of the U.S. within two-day truck freight.

Skilled labor

A deep, experienced regional manufacturing workforce.

Low industrial energy

Among the lowest power costs in the country.

250 mi500 miChicagoOhioN. VirginiaDallasAtlantaCharlotteJACKSON, MSFabTek Industries
The Demand Map

At the center of Southeast demand.

The Southeast is where utility load and hyperscale datacenters are growing fastest. From Jackson, FabTek ships into that surge by interstate, rail, and three Gulf ports.

Datacenter alley

Atlanta and the Southeast's hyperscale build-out.

Grid load growth

Substation and transformer demand at utility scale.

Three Gulf ports

Gulfport, Mobile, and New Orleans within hours.

Class I rail access

Direct rail for heavy and oversized freight.

MemphisBirminghamAtlantaGulfportMobileNew OrleansJACKSON, MSFabTek Industries
Proud Partners
Hitachi EnergySiemens EnergynVentEntergyValmont
Certifications & Memberships
ISO 9001:2015 AWS Certified Welding OSHA Safety Compliant IEEE 2000-HR Salt Spray

Come see the floor.

We host utility customers, EPCs, and OEMs for facility tours. Send us a note and we'll set it up.

Schedule a Tour