Built in the U.S.A.
Hazlehurst, MS·Call 601.892.5017·ISO 9001:2015

Since committing the business to the power grid, a core objective has been to stay ahead of capacity — reinvesting in square footage before demand requires it.

FabTek's production footprint has more than tripled since 2024. Today we operate over 250,000 square feet across four production sites in the Jackson, Mississippi metro, with a clear path to 500,000 square feet by 2030.

FabTek facility footprint by year: 50K sq ft in 2024 rising to a planned 500K sq ft by 2030

Each site addition has been a deliberate answer to a customer demand signal — more cabinet capacity, crane-handled heavy work, and dedicated space for newer product lines like bus ducts. We don't grow for the sake of square footage; we grow to keep saying yes to utility, EPC, OEM, and datacenter customers.

Capacity added ahead of the curve also protects the commitments that matter most to our customers: lead times and delivery dates. Dual-shift capability, overflow facilities, and backup equipment across our sites give us room to scale or shift work between buildings when volume spikes or the unexpected happens.

The grid's demand isn't slowing down — and neither are we. Reinvesting in capacity ahead of demand is how FabTek intends to remain the partner customers can depend on as the US power grid scales.

Share on LinkedIn ← Back to Newsroom
Proud Partners
Hitachi EnergySiemens EnergynVentEntergyValmont
Certifications & Memberships
ISO 9001:2015 AWS Certified Welding OSHA Safety Compliant IEEE 2000-HR Salt Spray

Have a power & utility spec to talk through?

Send us a drawing or a scope — we'll respond fast.

Request a Quote