
Domestic fabrication for the substation and power-infrastructure buildout behind hyperscale and colocation growth.
The data center buildout has turned electrical infrastructure into the long pole of every project. FabTek fabricates the bus ducts and busway housings, switchgear enclosures, transformer tanks, and substation structures that move power from the utility tie-in to the white space — built domestically, at volume, on a schedule.
Hyperscale and colocation operators are racing to add capacity faster than the supply chain can deliver it. Speed to power is the constraint, and imported equipment with months-long lead times is the bottleneck. A domestic fabrication partner that can scale a repeating scope is how that bottleneck gets removed.
FabTek brings substation steel, enclosures, and on-site field assembly together under one ISO 9001:2015 quality system — a single source for the structures, the housings, and the crews that bring a site online.
Hyperscale and colocation operators are adding capacity faster than the supply chain can deliver it. Speed to power is the constraint — and the electrical infrastructure that moves power from the utility tie-in to the white space has become the long pole of every project. FabTek fabricates that metalwork domestically, at volume, on your schedule — so power keeps pace with construction instead of holding it back.
Buildings go up fast. Energization doesn’t. The bus duct, switchgear enclosures, and substation steel between the utility and the data hall now dictate when a site can actually take load.
Months-long lead times on offshore equipment turn power distribution into the bottleneck — and every week of slip is megawatts of capacity sitting dark and unbilled.
Hyperscale programs repeat the same power packages across sites. Most shops can’t hold that volume to a consistent standard — so quality drifts and schedules wobble run to run.
Structures from one vendor, enclosures from another, field assembly from a third. Every handoff is a gap where the schedule — and accountability — can fall through.
When the schedule is measured in megawatts per month, every long-lead item is a threat. FabTek shortens that exposure by fabricating power-distribution metalwork domestically and standing up dedicated capacity for large, repeating data center scopes — so your power infrastructure keeps pace with construction instead of holding it back.
Bus duct, busway housings, and switchgear enclosures are exactly the kind of repeatable, tolerance-critical work our automated lines are built for. The same part, built the same way, run after run — with the quality records hyperscale and colocation programs require.
And when a site needs structures set and equipment assembled in the field, our crews handle on-site substation assembly — one accountable partner from steel to standing.


NEMA-rated transformer cabinets and metal enclosures.
View →
Metal enclosures and housings for switchgear and controls.
View →
Bus support structures and stands for buswork.
View →
Overhead busway runs for high-amperage distribution.
View →
Bus duct distribution and tap-off sections.
View →
Cable tray and raceway for power and data runs.
View →Send drawings, quantities, and milestone dates for your power-distribution and substation packages.
We return firm pricing, lead times, and a capacity plan sized to your delivery schedule.
Repeatable fabrication on automated lines under ISO 9001:2015, with full documentation.
Shipped on milestone, with on-site substation assembly crews available to set and build in the field.
FabTek fabricates bus ducts and busway housings, switchgear enclosures, transformer tanks, and substation structures — the metalwork that distributes power from the utility tie-in to the data hall — all built domestically and to your electrical design.
FabTek shortens lead times by fabricating domestically and standing up dedicated, reserved capacity for large repeating scopes. We plan production around your milestone schedule so power infrastructure keeps pace with construction.
Yes. Datacenter-grade bus duct and busway housings are a core FabTek product, fabricated on automated lines for the repeatability and quality high-density power distribution requires.
Yes. FabTek field crews provide on-site substation assembly — setting structures and assembling equipment — so a single domestic partner can take a site from steel to standing.
Yes. FabTek fabricates in Mississippi, built in the U.S.A., which removes overseas lead times and tariff risk from the equipment your timeline depends on.
Yes. With automated equipment, dual-shift capability, and reserved capacity, FabTek is built to absorb the large, repeating scopes that hyperscale and colocation programs generate.




Send us the scope — structures, enclosures, or a full substation package — and we'll get you a real answer fast.